Thursday, November 19, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Contract

Varansi: Three Rs.425.41 crore sewage projects completed

Fiinews by Fiinews
November 9, 2018
in Contract, Infrastructure, Investment, Projects
Reading Time: 1 min read
A A
0
0
SHARES
11
VIEWS
LinkedinShare on Twitter

Ramnagar works on Rs.71.91 crore project

 

Three sewage infrastructure projects, costing Rs.425.41 crore, has been completed in Varanasi, a release from the Public Information Bureau said on 8 Nov 2018.

The first is a 140 MLD Sewage Treatment Plant (STP) at Dinapur built at a cost of Rs.235.53 Crore. The project includes 10 years Operation & Maintenance agreement.

The second project includes three sewage pumping stations at Chaukaghat (140 MLD), Phulwaria (7.6 MLD) and Saraiya (3.7 MLD). The total cost for the three pumping stations was Rs.34.01.

The third project is the construction of 28 km long relieving trunk sewer, rising mains and interceptor sewers along Varuna and Assi at a cost of Rs.155.87 Crore.

Prime Minister Narendra Modi will dedicate these projects to the nation on 12 Nov 2018.

He also lay the foundation stone for Sewerage Management Scheme for Ramnagar. The Rs.72.91 crore project will include a 10 MLD STP and intercepting and diverting 4 drains.

These projects will treat 140 MLD sewage before releasing into the river thereby reducing the pollution of the river Ganga.

These project along with 2 other ongoing projects of 120 MLD at Goitha and 50 MLD STP at Ramana will take the sewage treatment capacity in the city to 412 MLD. This will be adequate for the sewage treatment requirements till year 2035.

There is no sewage treatment facility in the Ramnagar town. The Ramnagar project, the foundation stone for which is being laid, will intercept four main drains of Ramnagar town.

The intercepted wastewater will be treated at the proposed 10 MLD STP. fiinews.com

Tags: Narendra ModiThe Prime Minister
ShareTweetShare

Related Posts

PIB
Projects

Project: MoD inks contract with Israel Aerospace Industries

by Fiinews
November 19, 2026
0
10

Indian Naval platforms to get anti-air defence capability The Ministry of Defence has signed a contract with Israel Aerospace Industries...

HZL and Vedanta combined logo
Investment

Invest: HZL to double production to 2 mtpa

by Fiinews
November 19, 2026
0
15

CEO Prakash works on HZL 2.0 for India’s industrial development. Hindustan Zinc Limited (HZL - NSE:HINDZINC), the world’s largest integrated...

MRPL

Project: PM dedicates Bengaluru terminal to nation

November 16, 2026
21
Singapore Exchange

Invest: UTI Nifty listed in Singapore

November 14, 2026
20
Cochin Shipyard

Project: INS Betwa to be re-powered

November 13, 2026
25
A7

Invest: A7 expands cross-border payment in India

November 12, 2026
25
SBI YONO

Recent News

  • Project: MoD inks contract with Israel Aerospace Industries
  • Market: Urban consumers prefer electric mobility
  • Invest: HZL to double production to 2 mtpa
  • Market: Rootstock expands in India through Conserve
  • Market: HGS-Rackspace to grow in high-value GCCs

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.