Tuesday, November 3, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

The new terminal at Veer Savarkar International Airport by mid-2021

Fiinews by Fiinews
September 17, 2020
in Projects
Reading Time: 2 mins read
A A
0
PIB.

Port Blair's shell-shape airport terminal.

0
SHARES
14
VIEWS
LinkedinShare on Twitter

Terminal design inspired by nature

The Veer Savarkar International Airport at Port Blair is soon to have a new Rs.700 crore terminal building to handle 1,200 passengers during peak hours and about 50 lakh passengers annually.

More than 65% of project work is completed on the terminal with scheduled completion by the middle of 2021, said the Civil Aviation Ministry on 16 Sept 2020.

The surge in the passenger traffic, the Airports Authority of India has built the new terminal. The present terminal handles 18 lakh passengers annually.

With a total built up area of 40,837 sq m, the terminal is designed to have three-levels comprising of lower ground, upper ground and first floor.

The lower ground floor will be used as remote arrival, departure and service area, the upper ground floor will have an entry gate for departure passengers and exit gate for arrival passengers and the first floor as awaiting lounge for international passengers.

The building has 28 check-in counters, three passenger boarding bridges, five conveyor belts with an In-line scan system and state-of-the-art Firefighting and Fire Alarm system.

Inspired from nature, the design of the terminal is a shell-shape structure depicting sea and islands.

It is a structural steel framed building provided with aluminum sheet roofing and cable net glazing all around.

The entire terminal will also have 100% natural lighting through skylights provided at roof-level.

Curved shaped Cable Net Glazing will be provided all around the terminal building. #airport #IATA #terminal #building #construction #project #development /fiinews.com

Tags: Ministry of Civil Aviation
ShareTweetShare

Related Posts

Manastu
Projects

Project: RDI supports Manastu’s propulsion system

by Gurdip Singh
October 27, 2026
0
14

Technologies are important for strengthening India’s space capabilities In a significant step towards strengthening India’s indigenous space technology capabilities and...

Sonowal Korea
Projects

Project: Minister wants international standards

by Gurdip Singh
October 27, 2026
0
14

India's Maritime Single Window covers 69 ports and terminals Minister of Ports, Shipping and Waterways (MoPSW) Sarbananda Sonowal has told...

Nokia

Project: LTTS supports Nokia’s global R&D in India

October 26, 2026
17
Schneideer

Project: Schneider works on carbon emissions

October 23, 2026
11
Solidus

Project: Solidus delivers 27.31MW BESS to Ispat

October 23, 2026
10
Nuclear

Project: Nuclear to support tech-driven economy

October 21, 2026
10
SBI YONO

Recent News

  • Market: Seco develop Pune operations
  • Market: India represents growth for Infineum
  • Manufacture: GRSE-GSL to supply NGCs to Navy
  • Export: Brussels meetings discussed India-EU trade
  • Tender: $200m Africa Solar Facility announced

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.