Monday, November 16, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

Project: Subansiri hydro symbol of clean energy

Fiinews by Fiinews
December 25, 2025
in Projects
Reading Time: 3 mins read
A A
0
PIB

Subansiri Lower Hydroelectric Project

0
SHARES
18
VIEWS
LinkedinShare on Twitter

NHPC has implemented extensive riverbank protection Subansiri River

Power Minister Manohar Lal has inaugurated on 23 Dec the commercial operation of Unit–2 (250 MW) of the 2,000 MW (8×250 MW) Subansiri Lower Hydroelectric Project through virtual mode, declaring the project a symbol of India’s commitment to clean and sustainable energy, supporting North-East India’s growth, strengthening the national grid and advancing the country’s ambitious Net Zero goals https://www.conexpoconagg.com/.

Pankaj Agarwal, Secretary (Power), highlighted that the Subansiri Lower Project will greatly improve energy supply in the North-East and serve as a testament to India’s commitment to state-of-the-art, sustainable power systems. He emphasized timely commissioning of the remaining units, noting that the Subansiri Project will continue to play a pivotal role in India’s transition to a Net Zero energy future while generating substantial socio-economic benefits for local communities .

With the commissioning of Unit No.2, the Project is moving swiftly towards commissioning of 3 Units of 250 MW each shortly, followed by phased commissioning of the remaining four units during 2026-27. Upon full commissioning, the 2,000 MW Subansiri Lower Hydroelectric Project will make a significant contribution to India’s renewable energy capacity, enhance national grid resilience and usher in a new era in massive clean energy contribution https://www.bseindia.com/.

As India’s largest hydropower project, the Subansiri Lower Project comprises 8 units of 250 MW each and is designed as a Run-of-the-River scheme with small pondage, diverting water through eight Head Race Tunnels (HRTs) to generate 7,422 million units (MU) of renewable electricity annually contributing significantly to India’s green energy future. The project features the largest dam in North-East India, a 116-metre-high concrete gravity dam, which not only strengthens regional infrastructure and grid resilience but also enhances flood moderation and water management in the Subansiri River basin.

The Subansiri Lower H.E. Project exemplifies engineering excellence, featuring India’s heaviest hydro generator rotors, largest stators and biggest main inlet valves, along with innovations such as the nation’s largest aggregate processing plants, highest-capacity batching plant and first-ever use of Rotec’s Tower Belt for dam concreting in India. As the first cascaded dam on the Subansiri River, it provides flood moderation with a 442 million cubic metre flood cushion. With a gross reservoir storage of 1,365 million cubic metres at FRL, about one-third remains empty during floods to absorb excess water and protect downstream communities https://www.nseindia.com/.

NHPC has implemented extensive riverbank protection and erosion control measures along the Subansiri River, completing works up to 30 km downstream and extending them up to 60 km. with an investment of about Rs.522 crore. This has effectively stabilized the riverbanks for over five years. In addition, NHPC is supporting downstream community development through livelihood programs in piggery, sericulture and handloom, developed with IRMA. These initiatives, now in production, benefit around 5,000 women farmers and promote sustainable socio-economic development in the region.

Apart from supplying electricity to 16 beneficiary states across India, the Subansiri Lower H.E. Project will provide free power allocations to Arunachal Pradesh and Assam, while the North-East region will receive 1,000 MW from the project, significantly strengthening regional energy availability https://sbi.com.in/.

The project has generated strong socio-economic benefits for the region by engaging around 7,000 local people daily during its construction phase and creating numerous direct and indirect jobs through contractors, service providers and local markets. With the commissioning of the project and the availability of continuous power, new small-scale industries are expected to emerge, further expanding employment and business opportunities while helping reduce outmigration.

Additionally, the project is expected to boost tourism and enhance river navigation, contributing to long-term regional development and prosperity.

Over the last five decades, NHPC has successfully executed hydropower projects in some of the most challenging terrains and has diversified into solar, wind, and green hydrogen, reinforcing its position as a 100% Green Energy Company. With an installed capacity of 8,333 MW from 30 power stations and 14 projects totaling 9,704 MW currently under construction, NHPC continues to play a vital role in advancing India’s clean energy transition and strengthening national energy security. Fiinews.com

Tags: Ministry of Power
ShareTweetShare

Related Posts

Cochin Shipyard
Projects

Project: INS Betwa to be re-powered

by Fiinews
November 13, 2026
0
18

More than 50 MSMEs to benefit from naval frigate upgrade The Ministry of Defence has signed a contract worth Rs.498.58...

Mazagon Dock Shipbuilders
Projects

Project: Investors to get red carpet treatment

by Fiinews
November 11, 2026
0
19

India’s maritime transformation is not simply an infrastructure story, says Sankar A tripartite agreement signed in Oct 2026 between the...

Amini delivered

Project: Navy takes delivery of ASW SWC Amini

November 8, 2026
26
PIB

Project: Accelerate coal gasification, says Reddy

November 7, 2026
20
PIB

Project: Samsung MoU for industry-oriented skill

November 7, 2026
21
Thakral's Gurugram project.

Project: Thakral leases land to Manipal Health

November 6, 2026
20
SBI YONO

Recent News

  • Tech: Joshi’s call “think beyond boundaries”
  • Market: Drone industry set to grow to Rs.97,300cr
  • Tech: India-Italy implemented 150+ joint projects
  • Market: Indians urged to do global business
  • Export: sustain growth in shipments, says FIOE Chief

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.