Saturday, November 14, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

Project: Indigenously-designed PFBR started

Fiinews by Fiinews
April 29, 2026
in Projects
Reading Time: 3 mins read
A A
0
PIB

Minister Dr Jitendera Singh shares about the ongoing nuclear energy programme.

0
SHARES
18
VIEWS
LinkedinShare on Twitter

Reactor marks second stage of India’s 3-stage nuclear power program

India will be the second country in the world operating a commercial-level fast breeder reactor after Russia, Atomic Energy Minister Dr Jitendra Singh has told MPs and MLAs at a workshop on “Small Modular Reactors” on 27 April.

He elaborated that India has achieved a significant milestone by developing an indigenously designed 500 MWe Prototype Fast Breeder Reactor (PFBR) at Kalpakkam, Tamil Nadu, which achieved first criticality on 6 April 2026.

Developed by the Indira Gandhi Centre for Atomic Research (IGCAR) and built by BHAVINI, this reactor marks the start of the second stage of India’s three-stage nuclear power program, using uranium-plutonium mixed oxide fuel to produce more fuel than it consumes, he said. With this achievement, India moves toward leveraging its vast thorium reserves in the third stage of its nuclear strategy. Once fully operational, India will be the second country in the world after Russia operating a commercial-level fast breeder reactor, he added.

Dr Jitendra Singh further explained that the significance of this achievement lies in the fact that with this, India moves toward leveraging its vast thorium reserves in the third stage of its nuclear strategy.

Currently, Russia is the only country operating commercial fast breeder reactors (FBRs), with India in the advanced stage of commissioning its own. While several nations have historically developed or operated experimental fast reactors—specifically the USA, UK, France, Japan, Germany, and China—most of these programs are currently shut down.

Referring to recent developments in India’s three-stage nuclear programme, Dr Jitendra Singh said that the successful establishment of the Prototype Fast Breeder Reactor marks a significant step towards the second stage of the programme, enabling more efficient utilisation of nuclear fuel and paving the way for future use of India’s vast thorium reserves.

He emphasized that only a limited number of countries have made advancements in Fast Breeder Reactor technology, placing India in a distinguished global position in advanced nuclear capability.

The Minister further stated that nuclear energy will play a crucial role in India’s clean energy transition and long-term sustainability goals, particularly in achieving the target of 100 GW nuclear power capacity by 2047.

Highlighting emerging requirements, Dr Jitendra Singh said that sectors such as Artificial Intelligence, data infrastructure and advanced manufacturing will increasingly depend on reliable and continuous sources of clean energy, where nuclear power will be indispensable.

The Minister also underlined the importance of initiatives such as Small Modular Reactors (SMRs), policy support, and SHANTI Act enabling greater participation of the private sector in scaling up India’s nuclear energy capacity. He said, under the recently launched “Nuclear Mission”, with an allocation of Rs.20,000 crore, five SMRs are planned by 2033.

SMRs, the Minister said, will be useful for captive power generation, particularly in Industry, dense population zones, remote areas lacking grid connection, repurposing thermal plants etc.

Reiterating the government’s vision, the Minister said that a balanced energy mix, combining nuclear, renewable and other clean energy sources, will be key to achieving the goal of Net Zero by 2070. Fiinews.com

Tags: Dept of Atomic Energy
ShareTweetShare

Related Posts

Cochin Shipyard
Projects

Project: INS Betwa to be re-powered

by Fiinews
November 13, 2026
0
18

More than 50 MSMEs to benefit from naval frigate upgrade The Ministry of Defence has signed a contract worth Rs.498.58...

Mazagon Dock Shipbuilders
Projects

Project: Investors to get red carpet treatment

by Fiinews
November 11, 2026
0
19

India’s maritime transformation is not simply an infrastructure story, says Sankar A tripartite agreement signed in Oct 2026 between the...

Amini delivered

Project: Navy takes delivery of ASW SWC Amini

November 8, 2026
26
PIB

Project: Accelerate coal gasification, says Reddy

November 7, 2026
20
PIB

Project: Samsung MoU for industry-oriented skill

November 7, 2026
21
Thakral's Gurugram project.

Project: Thakral leases land to Manipal Health

November 6, 2026
20
SBI YONO

Recent News

  • Tech: India-Italy implemented 150+ joint projects
  • Market: Indians urged to do global business
  • Export: sustain growth in shipments, says FIOE Chief
  • Tender: PM officiates on Rs.15,600cr Bengaluru projects
  • Invest: UTI Nifty listed in Singapore

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.