Sunday, November 1, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tender: Overwhelming response to coastal highway

Fiinews by Fiinews
September 3, 2026
in Tenders
Reading Time: 2 mins read
A A
0
Conexpo
0
SHARES
24
VIEWS
LinkedinShare on Twitter

Construction of Rs.8,300.79cr Rameshwar to Paradeep project in two packages, says MoRTH

National Highways Authority of India (NHAI) has received an overwhelming response from the bidders for the implementation of 160 km long Access Controlled Greenfield Coastal National Highway from Rameshwar to Paradeep in Odisha, the Ministry of Road Transport and Highways said on 1 Sept.

Bids were invited by NHAI for construction of the project in two packages and both packages received encouraging participation from the bidders.

The 79.4 km long 4 lane access-controlled Rameshwar to Konark Package-I of the project received 10 bids, and 80.7 km long 2-lane with Paved Shoulder Konark to Paradeep Package-II received seven bids, reflecting robust competition and keen interest from the participants. The project will be awarded on Hybrid Annuity Mode (HAM).

The new coastal Highway from Rameshwar to Paradeep project was approved by the Cabinet Committee on Economic Affairs in June 2026 with a combined total capital cost of Rs.8,300.79 crores. During construction, the project is expected to have a potential to generate 53.6 Lakhs direct man-days and 67 lakh indirect man-days of employment.

With a design speed of 100 km/hour, the project will provide direct & fast connectivity to key tourist places like Sri Jagganath Temple, Puri Beach & Konark Sun Temple and help to reduce travel time between Rameshawar and Paradeep by about 2 hours and 30 minutes.

Rameshwar-Paradeep section of Coastal Highway will offer an alternate route for NH-16 & NH-316 and improve connectivity to Puri, Konark, Paradeep Port, upcoming Puri International Airport, facilitate smooth transportation to developing ports like Astarang and Subarnarekha as well as provide connectivity to Khurda, Puri, Kendrapada and Jagatsinghpur districts in Odisha.

The existing NH-16 is part of the Golden Quadrilateral and passes through major towns of Khordha, Bhubaneswar and Cuttack. Whereas NH-316 connects Bhubaneswar to Puri and further extends towards Satapada and Konark. The current sections along Puri–Satapada and Puri–Konark stretches has nearly 40% ribbon development along the corridor with high local commuter traffic, making the corridor unsuitable for high-speed long-distance vehicular movement.

The Rameshwar-Paradeep corridor will provide faster access-controlled connectivity, reduce fuel consumption, carbon emissions & vehicle operating costs, while lowering logistics costs and supporting economic growth across the region, the Ministry said. fiinews.com

Tags: MoRTH
ShareTweetShare

Related Posts

Hyundai
Tenders

Tender: JWG to work on Thoothukudi shipyard

by Gurdip Singh
October 29, 2026
0
10

DPR due in 6 months on Korean-supported $4bn project A joint working group (JWG) will oversee project development of India’s...

Rail Minister Vaishnaw
Tenders

Tender: 57 stations being redeveloped

by Gurdip Singh
October 27, 2026
0
10

Rs.75,000cr projects in progress in Jharkhand Minister for Railways Ashwini Vaishnaw said 57 stations in Jharkhand are being redeveloped under...

BAI

Tender: Ministry update on progress of projects

October 27, 2026
10
National Power Portal

Tender: India to add 70GW power in 2026-27

October 21, 2026
11
Green Evolve

Tender: Evolve Green plans 3GW RE projects by 2030

October 19, 2026
14
Ocean Circle Energy

Tender: Delhi brainstormed power requirements

October 17, 2026
23
SBI YONO

Recent News

  • Market: VinFast signs 50+ LoIs with e-motorcycles
  • Export: India commits Green Hydrogen to markets
  • Invest: AssetMark expands presence in India with GCC
  • Invest: Prince Alois updated on economic progress
  • Export: India-Mexico sign PTA Terms of Reference

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.