Friday, November 27, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tender: West Bengal set for Rs.75,000cr road projects

Fiinews by Fiinews
November 27, 2026
in Tenders
Reading Time: 5 mins read
A A
0
PIB.

West Bengal project inauguration ceremony.

0
SHARES
10
VIEWS
LinkedinShare on Twitter

Foundation stones laid for 22 National Highway

Minister for Road Transport & Highways Nitin Gadkari has announced a pipeline of road infrastructure projects worth approximately Rs.75,000 crore for West Bengal, encompassing high-speed corridors, expressways, bridges, road widening and road safety improvements.

Announcing the projects on 26 Nov, he also inaugurated and laid the foundation stones for 22 National Highway projects worth more than Rs.8,700 crore at Kolaghat, East Medinipur, West Bengal.

Highlighting the role of infrastructure in economic and social development, he said that efficient road connectivity is essential for industrial growth, trade, agricultural development and tourism. It also facilitates investment, generates employment and improves people’s access to markets, healthcare, education and other essential services.

Among the major projects announced by Shri Gadkari are:

Kolkata Ring Road: A 250-km Ring Road at an estimated cost of Rs.14,000 crore. It will connect Kolkata with Howrah and North and South 24 Parganas and link Kona Expressway, Belgharia Expressway and Kalyani Expressway, providing an alternative route for long-distance traffic and helping ease congestion in Kolkata.

Dankuni–Kolaghat Eight-Lane Corridor: A 58-km, eight-lane highway at an estimated cost of Rs.20,000 crore. The project is expected to reduce travel time by approximately 1.5 hours for vehicles travelling from Kolkata towards Kharagpur, Balasore and Bhubaneswar and improve connectivity with Haldia Port.

Moregram–Kishanganj High-Speed Corridor: A 245-km, four-lane corridor at an estimated cost of Rs.12,000 crore, including a 91-km stretch in West Bengal with an investment of Rs.4,500 crore. It will strengthen connectivity between NH-12 and NH-27 and improve access to border areas.

Barasat–Petrapole Highway: A 75-km, four-lane highway at an estimated cost of Rs.8,000 crore to improve connectivity between Barasat, Basirhat and Bangaon and strengthen cross-border connectivity with Bangladesh.

Belgharia Expressway: A 7-km, six-lane elevated road at an estimated cost of Rs.1,000 crore to improve connectivity to Netaji Subhas Chandra Bose International Airport and ease traffic pressure between North Kolkata and NH-19.

District Connectivity, Bridge Development and Road Widening

The Minister also announced several projects to strengthen connectivity across districts and improve access to important economic and tourism centres. These include:

A four-lane bridge over the Mayurakshi River in Birbhum district at an estimated cost of Rs.1,000 crore.

A 15-km, four-lane road from Rampurhat to Sinchura at a cost of Rs.875 crore.

Improvement of 34 km of NH-131A between Malda and Durgapur at a cost of Rs.750 crore.

Construction of bridges and four-lane roads in Malbazar, Gurjan, Jhora, Mal and Neora in Jalpaiguri district at a cost of Rs.375 crore.

A six-km, four-lane bridge over the Damodar River at a cost of Rs.300 crore.

A bridge over the Mahananda River in Darjeeling district at a cost of Rs.270 crore.

Widening of 47.55 km of roads between Telipara–Jumuar and Birpara–Falakata at a cost of Rs.1,500 crore.

Widening of 106.61 km of NH-512 between Gazole and Hili at a cost of Rs.3,000 crore.

Widening of 31.24 km of NH-117 (New NH-12) between Joka and Diamond Harbour at a cost of Rs.1,000 crore.

Widening of 89 km of NH-116B between Nandakumar and Digha at a cost of Rs.2,700 crore.

A 54-km road project between Namkhana and NH-12 at an estimated cost of Rs.500 crore to ease congestion between Diamond Harbour and Namkhana and improve identified accident-prone locations.

Strengthening Road Safety and Interstate Connectivity

Gadkari also announced improvement works at 59 identified black spots across West Bengal at an estimated cost of Rs.5,100 crore. These include 25 locations in Malda, 20 in Nadia, nine in Jalpaiguri and five in Paschim Bardhaman. The proposed works include Vehicle Underpasses, Light Vehicle Underpasses and service roads to improve traffic movement and address accident-prone locations.

Highlighting the importance of interstate connectivity, the Minister referred to the 570-km, six-lane Gorakhpur–Siliguri Greenfield Highway, approved at an estimated cost of Rs.38,000 crore, and the proposed Siliguri–Guwahati High-Speed Corridor, for which the Detailed Project Report has been completed. He also highlighted the Kharagpur–Bardhaman–Moregram Greenfield Expressway, Varanasi–Kolkata Greenfield Highway and proposed Raxaul–Haldia corridor, which will strengthen connectivity with Bihar, Jharkhand and important economic centres, including Haldia Port.

He emphasised that the planned highway network would facilitate the movement of goods, improve access to industrial and agricultural centres, support tourism and create new economic opportunities.

Nitin Gadkari appreciated the State Government in facilitating timely land acquisition, removing encroachment and necessary clearances for expeditious implementation of the projects in last 6 months and expecting the same continuous support in future projects also.

The initiatives will strengthen West Bengal’s road infrastructure and its connectivity with neighbouring States, ports, airports, industrial centres and international borders, supporting trade, regional development and improved mobility for citizens.

The programme was attended by West Bengal Chief Minister Suvendu Adhikari, State Public Works Minister Ajay Kumar Poddar, Minister of State Nadiyar Chandra Bauri, Members of Parliament, Members of the Legislative Assembly, public representatives and senior officials from the Ministry of Road Transport and Highways (MoRTH), National Highways Authority of India (NHAI) and the State Government.

The Minister stated that National Highway projects worth approximately Rs.40,000 crore had been completed in West Bengal, while works worth around Rs.35,000 crore were underway. He emphasised the need for timely land acquisition and necessary clearances to ensure the expeditious implementation of projects.

Two important National Highway projects were inaugurated and dedicated to the nation:

Palsit–Dankuni section of NH-19: The 63.83-km stretch has been upgraded to six lanes. It will strengthen connectivity between Howrah, Hooghly and Burdwan, facilitate faster freight movement and support commercial activities along the Kolkata–Durgapur industrial corridor.

Four-lane bridge over the Ganga at Farakka: Constructed at a cost of Rs.521.20 crore, the bridge and its connecting roads will improve connectivity between Murshidabad and Malda, reduce travel time across the Ganga and facilitate movement towards North Bengal.

Foundation Stones Laid for 20 National Highway Projects

Foundation stones were laid for 20 projects aimed at improving road safety, strengthening bridge infrastructure and enhancing connectivity across the State.

Under the Road Safety Scheme, 57 Vehicle Underpasses (VUPs) and Light Vehicle Underpasses (LVUPs) on NH-12 and NH-19 will facilitate safer and smoother traffic movement. The Ramanagar Bypass on NH-116B will help ease congestion within the town, while road-widening and bypass works will reduce travel time and fuel consumption.

Under the Setubandhan Scheme, two major bridge projects at Norghat and over the Dwarkeshwar River will improve regional connectivity. These projects will strengthen access to tourism destinations such as Digha, Mandarmani, Tajpur and Bakkhali, supporting tourism and fisheries-related activities. Improved connectivity towards the Jharkhand border at the Gowai River check post will also facilitate interstate freight movement.

Collectively, these projects will improve connectivity between Kolkata, Krishnanagar, Baharampur, Malda and Durgapur. Fiinews.com

Tags: MoRTH
ShareTweetShare

Related Posts

PIB
Tenders

Tender: Approved Rs.643.14cr of Bridges and Roads in MP

by Fiinews
November 27, 2026
0
15

Minister Chouhan announced that a dedicated Scientific Agricultural Roadmap In a major boost to rural connectivity, the Centre has approved...

KPL
Tenders

Tender: Second Container Terminal at Kamarajar approved

by Fiinews
November 27, 2026
0
17

Project to be implemented under PPP Mode on DBFOT Basis The Cabinet Committee on Economic Affairs has approved a Rs.4,288.26...

AirSewa

Tender: India-Singapore MRO approved

November 27, 2026
16
Aai

Tender: Cabinet approves Doloo greenfield airport

November 27, 2026
15
PIB

Tender: PM critically reviewed Rs.78,000cr projects

November 27, 2026
16
NEDA AGM

Tender: NEDA calls for investment in supply chain ecosystem

November 26, 2026
20
SBI YONO

Recent News

  • Invest: 200 stakeholders joined Minister’s Pre-Budget consultations
  • Tender: West Bengal set for Rs.75,000cr road projects
  • Manufacture: JDCC to accelerate defence production
  • Project: NLMC considers Rs.1,300cr asset monetisation
  • Tender: Approved Rs.643.14cr of Bridges and Roads in MP

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.