Sunday, November 1, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

Bidding guidelines

Fiinews by Fiinews
November 4, 2016
in Projects
Reading Time: 2 mins read
A A
0
0
SHARES
12
VIEWS
LinkedinShare on Twitter

Bidding guidelines

India opportunity beckons_Updated_Black-2 copy

Ministry of New and Renewable Energy (MNRE) has issued Guidelines for transparent bidding process for implementation of Scheme for setting up of 1000 MW Wind Power Project connected to inter-state transmission system (ISTS).

As per Guidelines, the Wind Power Projects will be selected through open and transparent competitive bidding followed by e-reverse auction and the capacity may go higher than 1000 MW, if there is demand from Buying Entities.

PTC India Ltd, trading company selected under the scheme, will sign Power Purchase Agreement (PPA) with wind projects at bidded tariff and back-to-back Power Sale Agreement (PSA) with Buying Entities at a pooled price of the total bids selected. The term of PPA and PSA will be 25 years.

Bidder can bid for a minimum capacity of 50 MW and maximum up to 250 MW. Bidder is allowed to install 5% of additional rated capacity that will compensate auxiliary consumption and system losses up to interconnection point.

The Guidelines are available at http://mnre.gov.in/file-manager/grid-wind/Scheme-for-Setting-up-of-1000-MW-ISTS-connected-Wind-Power-Projects.pdf

The Ministry sanctioned a Scheme for setting up of 1,000 MW ISTS connected Wind Power Project on 14 June 2016.

The Scheme is to encourage competitiveness through scaling up of project sizes and introduction of efficient and transparent e-bidding and e-auctioning processes. It will also facilitate fulfilment of Non-Solar Renewable Purchase Obligation (RPO) requirement of non-windy states.

In order to facilitate transmission of wind power from these windy states to non-windy states provisions have been made in the Tariff Policy to waive the inter-state transmission charges. fii-news.com

Tags: MNREWind Energt
ShareTweetShare

Related Posts

Manastu
Projects

Project: RDI supports Manastu’s propulsion system

by Gurdip Singh
October 27, 2026
0
10

Technologies are important for strengthening India’s space capabilities In a significant step towards strengthening India’s indigenous space technology capabilities and...

Sonowal Korea
Projects

Project: Minister wants international standards

by Gurdip Singh
October 27, 2026
0
10

India's Maritime Single Window covers 69 ports and terminals Minister of Ports, Shipping and Waterways (MoPSW) Sarbananda Sonowal has told...

Nokia

Project: LTTS supports Nokia’s global R&D in India

October 26, 2026
12
Schneideer

Project: Schneider works on carbon emissions

October 23, 2026
10
Solidus

Project: Solidus delivers 27.31MW BESS to Ispat

October 23, 2026
10
Nuclear

Project: Nuclear to support tech-driven economy

October 21, 2026
10
SBI YONO

Recent News

  • Market: VinFast signs 50+ LoIs with e-motorcycles
  • Export: India commits Green Hydrogen to markets
  • Invest: AssetMark expands presence in India with GCC
  • Invest: Prince Alois updated on economic progress
  • Export: India-Mexico sign PTA Terms of Reference

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.