Friday, November 20, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Projects

Project: Dastur completes US-funded Techno-Economic Feasibility at IOCL refinery

Fiinews by Fiinews
April 16, 2022
in Projects
Reading Time: 3 mins read
A A
0
Dastur Energy
0
SHARES
13
VIEWS
LinkedinShare on Twitter

IOCL and ONGC to pursue goal of combining industrial-scale carbon capture

Dastur International, Inc. and Dastur Energy has completed a US-funded Techno-Economic Feasibility of the Indian Oil Corporation Limited’s (IOCL) Carbon Capture and Utilization Project at the 13.7 mtpa Koyali refinery in Gujarat. The project was funded by a grant from the United States Trade and Development Agency (USTDA).

The project, as designed, provides IOCL with a technically and economically viable solution for capturing up to almost 0.7 mtpa (million tonnes per annum) of carbon dioxide from its Steam Methane Reforming (SMR) based Hydrogen Generation Units (HGU) at a very competitive cost structure.

The captured CO2 will be primarily used at the Oil and Natural Gas Commission’s (ONGC) Gandhar oilfields for enhanced oil recovery (EOR) from its maturing oil wells. A part of the captured CO2 is also expected to be liquefied and purified to 99.9% for supply to food and beverage sector consumers.

The carbon capture solution designed by Dastur would allow IOCL to substantially decarbonize its HGU operations and support IOCL’s strategy of producing clean hydrogen. The project also supports the Indian Government’s mandate of decarbonizing the oil & gas sector.

With carbon accounting likely to become a reality in developing carbon markets, this carbon capture project can be expected to provide a competitive advantage to IOCL in the form of carbon credits in the international markets.

The carbon capture system designed by Dastur provides IOCL with an integrated solution across the carbon value chain, enabling industrial-scale carbon capture and disposition.

The project brings together Austin, Texas-based Dastur Energy’s knowhow and capabilities in the areas of energy engineering, gas processing, carbon capture technologies, energy supply chains and economics; Houston-based Air Liquide’s carbon capture technology offerings; the University of Texas at Austin’s Bureau of Economic Geology’s (BEG) experience in research and development in EOR; and India based M. N. Dastur & Co (P) Ltd’s engineering and capital project delivery capabilities.

S.S.V. Ramakumar, Director (R & D) and Board member of IOCL, said, “The project and Dastur’s work provide a blueprint for IOCL and ONGC to pursue the ambitious goal of combining industrial-scale carbon capture with CO2 EOR in India.

“Dastur and its partners evaluated different CO2 sources and carbon capture technologies from multiple vendors to engineer a techno-economically feasible solution that we can implement within the constraints and challenges of a large and complex operating refinery. The novel use of advanced gas processing to provide an extremely competitive cost of carbon capture bodes well for the future success of the project.”

Atanu Mukherjee, President and Chief Executive Officer of Dastur, said, “I want to thank IOCL and our partners for their contribution in achieving a globally competitive cost of CO2 capture, including opex and capex in this design and charting the path forward for the first industrial-scale CCUS project in India.

“Carbon capture and its effective utilization is a central building block for enabling the future transition to net zero. We are committed to supporting our clients worldwide in implementing effective energy transition plans, whether it be at North America’s first carbon capture project at the blast furnaces at Cleveland-Cliffs’ Burns Harbor steel plant or a Middle East oil major’s recent plan to capture multi-million tonnes of CO2 for large scale EOR.” fiinews.com

Tags: DasturIOCL
ShareTweetShare

Related Posts

PIB
Projects

Project: MoD inks contract with Israel Aerospace Industries

by Fiinews
November 20, 2026
0
18

Indian Naval platforms to get anti-air defence capability The Ministry of Defence has signed a Rs.1,976.40 crore contract with Israel...

MRPL
Projects

Project: PM dedicates Bengaluru terminal to nation

by Fiinews
November 16, 2026
0
21

MRPL has dedicated ethanol and biodiesel storage and blending infrastructure Prime Minister Narendra Modi has dedicated to the nation Mangalore...

Cochin Shipyard

Project: INS Betwa to be re-powered

November 13, 2026
25
Mazagon Dock Shipbuilders

Project: Investors to get red carpet treatment

November 11, 2026
20
Amini delivered

Project: Navy takes delivery of ASW SWC Amini

November 8, 2026
27
PIB

Project: Accelerate coal gasification, says Reddy

November 7, 2026
26
SBI YONO

Recent News

  • Invest: PM applauds rating agencies take on economy
  • Invest: Italian companies keen on India
  • Invest: Perma-Pipe acquires 51% of Welspun unit
  • Invest: KKR takes minority stake in Gentari
  • Project: MoD inks contract with Israel Aerospace Industries

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.