Tuesday, November 17, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tenders: PM lays foundation stone of 300 MW solar plant at Bikaner

Fiinews by Fiinews
February 17, 2024
in Tenders
Reading Time: 2 mins read
A A
0
PIB

PM lays foundation stone for the Bikaner Solar Project.

0
SHARES
11
VIEWS
LinkedinShare on Twitter

MNRE offers Rs.134.70 cr Viability Gap Funding

In a major thrust towards achieving Government of India’s Renewable Energy capacity addition target and the goal of Net Zero by the year 2070, Prime Minister Narendra Modi has laid the foundation stone of the 300 MW Solar Power Plant at Bikaner.

The Rs.1,732 crore project at Karnisar-Bhatiyan vilage, in Poogal Tehsil, Bikaner, is being set up by NHPC Limited under Government’s CPSU Scheme, Phase-II, Tranche-III. The PM laid the stone through video conferencing mode on 16 Feb 2024.

Equipped with cutting-edge technology, including high-efficiency bifacial modules manufactured in India, the solar project aligns with the Atma Nirbhar Bharat initiative.

The electricity generated will be transmitted through Bikaner-II Inter State Transmission System Substation. The project aims to produce around 750 million units of green power annually, considering a Capacity Utilization Factor (CUF) of 28.50%. This will thereby offset carbon dioxide emissions of approximately 18,000 million Metric tons over its lifetime.

The Power Usage Agreement for the project has been inked with Punjab State Power Corporation Limited (PSPCL), at a competitive tariff of Rs.2.45/unit for 25 years, considering Viability Gap Funding (VGF) of Rs.134.70 crores offered by the Ministry of New & Renewable Energy (MNRE).

The project is scheduled for commissioning by September 2024. It has the potential to create around employment opportunities for approximately 600 individuals indirectly during the project phase and 100 personnel during the Operations & Maintenance phase.

Furthermore, as per the provisions of Solar Policy of the state, the Government of Rajasthan will also get a contribution towards Rajasthan Renewable Energy Development Fund for development of large power system infrastructure for grid management, other supporting infrastructure and facilitation works for the stakeholders. Fiinews.com

Tags: Ministry of Power
ShareTweetShare

Related Posts

Namma Metro
Tenders

Tender: PM officiates Rs.15,600cr Bengaluru projects

by Fiinews
November 16, 2026
0
22

Namma Metro result of new thinking on ‘Ease of Travel’ Prime Minister Narendra Modi has inaugurated, dedicated to the nation,...

Jacobs
Tenders

Tender: Jacobs to plan Cochin Int Airport

by Fiinews
November 13, 2026
0
17

CIAL work on comprehensive 25-year master plan Jacobs (NYSE: J) has been appointed by Cochin International Airport Limited (CIAL) to...

PIB

Tender: Foundation stones laid for 4 port projects

November 13, 2026
24
PIB.

Tender: Aqua Line Metro Corridor approved

November 13, 2026
19
IPA

Tender: Report calls for 4 types of gateways

November 11, 2026
19
Shah Projects

Tender: Work commenced on Bopal-Ghuma pump

November 11, 2026
16
SBI YONO

Recent News

  • Tech: DataSwitch’s Mathi automates data mapping
  • Export: India-Thailand traded $21.49bn in FY25-26
  • Export: India-Egypt set $12bn bilateral trade target
  • Manufacture: TN facility to produce from Dec 2026
  • Market: Hanon reinforced commitment to India

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.