Saturday, November 28, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tender: Varuna Corridor gets strong response from bidders

Fiinews by Fiinews
November 28, 2026
in Tenders
Reading Time: 3 mins read
A A
0
Conexpo
0
SHARES
10
VIEWS
LinkedinShare on Twitter

Main carriageway, flyovers, loops, ramps, service roads designed for Rs.25cr projects

The National Highways Authority of India (NHAI) has received eight bids for Package-I and seven bids for Package-II for the Varuna Elevated Corridor along the Rivers Ganga and Varuna in Varanasi, saying the 89.2-km projects will connect NH-31 and Varanasi Ring Road along the River Varuna; and NH-19 to Varanasi Ring Road along the River Ganga in Varanasi, Uttar Pradesh.

The projects were approved by the Cabinet Committee on Economic Affairs in July 2026, the Ministry of Road Transport and Highways said on 27, reporting “encouraging support” for the corridor development.

Varuna Elevated Corridor: Improved connectivity between NH-31 and Varanasi Ring Road

The 43.2-km long Varuna Elevated Corridor will connect NH-31 with the Varanasi Ring Road, running along River Varuna. The project will be implemented on Hybrid Annuity Model (HAM) with a total capital cost of Rs.10,998.32 crore and will provide improved access to important transport terminals as well as key locations in Varanasi city. The project comprises a 6/4-lane predominantly elevated corridor, including main carriageway, flyovers, loops, ramps, service roads and will be implemented in two packages.

The corridor is a major component of the Varanasi Decongestion Plan and will provide seamless connectivity between NH-31 and Kashi Railway Station, while substantially improving access to Varanasi Ring Road, Varanasi Airport, Kashi Railway Station, Varanasi City Railway Station, Varanasi Junction, Deen Dayal Upadhyaya Junction, Ramnagar Port, Sampurnanand Sanskrit University, the ghats of Varanasi and the adjoining Chandauli region.

Designed for an operating speed of 80–100 km/h, the project will reduce travel time between NH-31 and Kashi Railway Station from approximately 40 minutes to 20 minutes, representing a reduction of nearly 50 per cent. It will significantly decongest the city’s road network, improve road safety, reduce vehicle operating costs and facilitate faster, uninterrupted movement of passenger and freight traffic, the Ministry said.

The project will also strengthen regional connectivity by improving access to one Economic Node (Chandauli Social Economic Zone), one Social Node (Chandauli) and six major Logistics Nodes, thereby enhancing multimodal integration in line with the PM Gati Shakti National Master Plan.

It will facilitate efficient movement of agricultural produce, industrial goods, construction materials and minerals, improve logistics efficiency and support sustainable economic growth across eastern Uttar Pradesh, the Ministry added.

Ganga Elevated Corridor: Strengthening riverfront connectivity and access to key destinations

The 46-km long six lane elevated Ganga Corridor will connect NH-19 with Varanasi Ring Road, providing riverbank connectivity along the River Ganga. The project will be implemented on Hybrid Annuity Model (HAM) at a total capital cost of Rs.14,447.64 crore. The project has been divided into two packages and includes construction of a six-lane elevated main carriageway, a 910-meter-long cable-stayed bridge, a 1.32 km long extradosed Foot Over Bridge-cum-Major Bridge, loops, ramps, link roads and service roads.

The corridor has been conceived as a transformative urban mobility project to decongest the road network of Varanasi & Chandauli by providing a high-speed, access-controlled connection between NH-19, the Varanasi Ring Road (NH-135B), Ramnagar/ BHU and other major urban destinations. Designed for an operating speed of 80–100 km/h, it will reduce average travel time from around 60 minutes to 20 minutes, representing a reduction of nearly 67 per cent. Travel time between NH-19 and Kashi Railway Station will be reduced from approximately 50 minutes to about 25 minutes, resulting in a saving of about 25 minutes (nearly 50 per cent).

Aligned with the PM Gati Shakti National Master Plan, the corridor will strengthen multimodal connectivity by providing seamless access to major highways, railway stations, Lal Bahadur Shastri Airport and Ramnagar IWAI Port, while significantly improving connectivity to key religious, educational and cultural landmarks, including the Kashi Vishwanath Temple, Banaras Hindu University (BHU), Namo Ghat, Ramnagar Fort and the Ghats of Varanasi. By linking important economic, social and logistics nodes, the project will improve logistics efficiency, enhance road safety, facilitate tourism and pilgrimage, and support sustainable regional economic growth across eastern Uttar Pradesh.

Both these elevated corridor projects are aimed at addressing growing traffic requirements of Varanasi city. By providing improved connectivity between the National Highways, ring road and important city destinations, the projects will help to reduce traffic congestion in the urban centre, facilitate smoother movement of local and through traffic and improve accessibility for residents, commuters and pilgrims.

The projects will also support tourism and pilgrimage-related activities, stimulate economic growth and contribute to the socio-economic development of Varanasi and surrounding region, added the Ministry. Fiinews.com

Tags: MoRTH
ShareTweetShare

Related Posts

PIB.
Tenders

Tender: West Bengal set for Rs.75,000cr road projects

by Fiinews
November 28, 2026
0
22

Foundation stones laid for 22 National Highway Minister for Road Transport & Highways Nitin Gadkari has announced a pipeline of...

PIB
Tenders

Tender: Approved Rs.643.14cr of Bridges and Roads in MP

by Fiinews
November 27, 2026
0
17

Minister Chouhan announced that a dedicated Scientific Agricultural Roadmap In a major boost to rural connectivity, the Centre has approved...

KPL

Tender: Second Container Terminal at Kamarajar approved

November 27, 2026
19
AirSewa

Tender: India-Singapore MRO approved

November 27, 2026
16
Aai

Tender: Cabinet approves Doloo greenfield airport

November 27, 2026
15
PIB

Tender: PM critically reviewed Rs.78,000cr projects

November 27, 2026
16
SBI YONO

Recent News

  • Tender: Varuna Corridor gets strong response from bidders
  • Project: 6.59-km tunnel-14 breakthrough achieved
  • Invest: GIFT discussed market options at SFF
  • Market: Harley-Davidson strengthens presence in India
  • Invest: 200 stakeholders joined Minister’s Pre-Budget consultations

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.