Friday, November 6, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tender: Lucknow Metro Phase-1B approved

Fiinews by Fiinews
August 14, 2025
in Tenders
Reading Time: 3 mins read
A A
0
UPMetroRail
0
SHARES
54
VIEWS
LinkedinShare on Twitter

Project to have 7 underground-5 elevated stations across 11.165 km route

The Cabinet has approved on 12 Aug the Phase-1B of Lucknow Metro Rail Project with corridor for a length of 11.165 km with 12 stations – 7 underground and 5 elevated with an outlay of Rs.5,801 crore. On operationalization of Phase-1B, Lucknow city will have 34 km of active Metro Rail Network http://lmrcl.com.

The Phase-1B will integrate key zones of Old Lucknow, including:

Commercial hubs such as Aminabad, Yahiyaganj, Pandeyganj, and Chowk https://www.conexpoconagg.com/;

Critical healthcare facilities, most notably the King George’s Medical University (Medical College);

Major tourist attractions, including Bara Imambara, Chota Imambara, Bhool Bhulaiya, Clock Tower, and Rumi Darwaza;

Culinary destinations known for the city’s rich and historic food culture https://ted.europa.eu/en/.

By bridging these vital areas with the metro network, Phase-1B will not only enhance connectivity but also stimulate economic activity, tourism, and ease urban mobility for both residents and visitors, the Cabinet said https://www.bseindia.com/.

Reduction in Traffic Congestion: Metro Rail as an efficient alternate road transport and with Phase-1B as an extension to the Metro Rail network in the Lucknow city is expected to alleviate traffic congestion and will be particularly impactful on heavily congested routes of the Old Lucknow. Reduction in road traffic can lead to smoother movement of vehicles, reduction in travel time, increasing overall road safety etc.

Environmental Benefits: The addition of Phase-1B Lucknow Metro Rail Project and increase in overall Metro Rail Network in Lucknow city, will significantly reduce carbon emissions compared to traditional fossil fuel-based transport https://www.nseindia.com/.

Economic Growth: Reduced travel times and improved access to different parts of the city such as Airport, Railway Stations and Bus Depots can enhance productivity by allowing individuals to reach their workplaces and destinations more efficiently. Also, the enhanced connectivity can stimulate local businesses, especially in areas near new metro stations which can also attract investment and development in previously less accessible regions.

Social Impact: The expansion of Phase-1B Metro Rail network in Lucknow will provide more equitable access to public transport, benefiting diverse socio-economic groups and reducing transport disparities which will contribute to a higher quality of life by reducing commute times and improving access to essential services https://sbi.com.in/.

The Phase-1B Lucknow Metro Rail Project is set to be a transformative development for the city. It promises to deliver enhanced connectivity, reduced traffic congestion, environmental benefits, economic growth, and improved quality of life. By addressing key urban challenges and providing a foundation for future expansion, Phase-1B will play a crucial role in shaping the city’s development trajectory and sustainability. Fiinews.com

Tags: The Cabinet
ShareTweetShare

Related Posts

IESA
Tenders

Tender: Rs.14,500cr VGF for 92 GWh storage system

by Fiinews
November 6, 2026
0
24

Rs.97,600cr investment expected in energy technologies The Cabinet has approved the Viability Gap Funding (VGF) Scheme for Development of Grid-Scale...

Rivar
Tenders

Tender: Rivar to build Rs.3,000cr sports city

by Fiinews
November 4, 2026
0
17

European group explores opportunities with several state governments in aerospace, deeptech, advanced manufacturing and science and technology innovation The Government...

PIB

Tender: Rs.1,500cr Puri terminal announced at PPA

November 4, 2026
15
PIB

Tender: $200m Africa Solar Facility announced

November 4, 2026
21
Hyundai

Tender: JWG to work on Thoothukudi shipyard

October 29, 2026
19
Rail Minister Vaishnaw

Tender: 57 stations being redeveloped

October 27, 2026
18
SBI YONO

Recent News

  • Project: Accelerate coal gasification, says Reddy
  • Project: Samsung MoU for industry-oriented skill
  • Export: India to ship green molecules to globally
  • Market: Partners to scale agentic AI for customers
  • Tech: Partners help with risk solutions in India

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.