Friday, November 6, 2026
  • Home
  • About us
  • Privacy policy
  • Advertise with us
  • Contact us
Fii News Logo
No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Newsletter
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEANFastest Growing
Fiinews
No Result
View All Result
Home Tenders

Tender: Rail upgrades communication-Kavvach system

Fiinews by Fiinews
March 27, 2026
in Tenders
Reading Time: 3 mins read
A A
0
Ministry of Railways
0
SHARES
17
VIEWS
LinkedinShare on Twitter

Rs.1,236cr proposals approved for Railways network

The Ministry of Railways has approved a comprehensive set of projects worth approximately Rs.1,236 crore aimed at significantly upgrading its communication backbone and expanding the Kavach automatic train protection system across multiple zones.

These approvals cover three separate proposals. Two are focused on optical fibre and ground wire infrastructure on Central and Western Railways, and one on deployment of Kavach on high-utilisation routes of Southern Railway, the Ministry said on 25 Mar.

Central Railway Gets Upgraded Fibre Network: Rs.623.63 crore

Two complementary works have been approved to build a robust, dual-path communication backbone across Central Railway’s network, covering all five of its divisions — Solapur, Nagpur, Pune, Bhusawal and Mumbai.

First, a special type of composite overhead wire called OPGW (96 fibre) will be installed along the existing 25 KV electric traction lines on 2,250.68 Rkm, covering Solapur, Nagpur, Pune, and Bhusawal Divisions. This wire does two jobs at once: it acts as an earth protection wire for the traction system and also carries optical fibre for communication. Since it runs on the existing traction towers, no new civil infrastructure is needed. Cost: Rs.238.94 crore.

Second, underground optical fibre cables (2×48 fibre) will be laid on one side of the track over 2,673.21 Rkm across all five divisions — Solapur, Pune, Nagpur, Bhusawal, and Mumbai. Together with the OPGW on the other side, this creates two independent fibre paths on every route, ensuring the communication network stays operational even if one path fails. Cost: Rs.384.69 crore.

The additional fibre capacity will also be leased out as dark fibre, generating revenue for Indian Railways.

Kavach Safety System Extended to 548 km on Southern Railway: Rs.310.18 crore

Kavach is Indian Railways’ automatic train protection system that prevents collisions by automatically applying brakes if two trains are on a collision course or if a signal is passed at danger. Under this approval, it will be deployed on high-traffic routes across Tamil Nadu, Kerala, and Karnataka.

Under this approval, Kavach version 4.0 will be deployed on two sections of Southern Railway:

Jolarpettai–Erode (180 Rkm, Salem Division) and Chennai Beach – Tambaram – Chengalpattu (60 km, Chennai Division) — along with new optical fibre cabling. Cost: Rs.158.74 crore.

Shoranur–Mangalore (308 km, Palakkad Division) — along with new 4×48 fibre OFC cabling. Cost: Rs.151.44 crore.

These works are part of Southern Railway’s sub-umbrella project worth Rs.2,950 crore.

Western Railway to Complete Fibre Backbone for Rajkot and Bhavnagar Divisions at Rs.302.26 crore

Optical fibre cables (2×48 fibre, on each side of track) will be laid on the remaining stretches of two Western Railway divisions in Gujarat — 1,064 km in Rajkot Division and 589 km in Bhavnagar Division, totalling 1,653 km. This fills the last gaps in the fibre communication network of these divisions.

A strong fibre backbone is essential for Kavach and LTE-based train control systems to function reliably. Completing this network ensures Western Railway’s Kavach rollout can move forward without delays. These works are part of Western Railway’s sub-umbrella project worth Rs.2,800 crore.

These projects are part of Indian Railways’ broader strategy to modernise infrastructure through integration of advanced communication systems and safety technologies, the Ministry said. The strengthening of traction-linked communication systems and expansion of OFC networks will play a vital role in supporting Kavach, improving operational efficiency, enhancing safety and enabling future-ready railway operations across the country. Fiinews.com

Tags: Ministry of Railways
ShareTweetShare

Related Posts

IESA
Tenders

Tender: Rs.14,500cr VGF for 92 GWh storage system

by Fiinews
November 6, 2026
0
24

Rs.97,600cr investment expected in energy technologies The Cabinet has approved the Viability Gap Funding (VGF) Scheme for Development of Grid-Scale...

Rivar
Tenders

Tender: Rivar to build Rs.3,000cr sports city

by Fiinews
November 4, 2026
0
17

European group explores opportunities with several state governments in aerospace, deeptech, advanced manufacturing and science and technology innovation The Government...

PIB

Tender: Rs.1,500cr Puri terminal announced at PPA

November 4, 2026
15
PIB

Tender: $200m Africa Solar Facility announced

November 4, 2026
21
Hyundai

Tender: JWG to work on Thoothukudi shipyard

October 29, 2026
19
Rail Minister Vaishnaw

Tender: 57 stations being redeveloped

October 27, 2026
18
SBI YONO

Recent News

  • Project: Accelerate coal gasification, says Reddy
  • Project: Samsung MoU for industry-oriented skill
  • Export: India to ship green molecules to globally
  • Market: Partners to scale agentic AI for customers
  • Tech: Partners help with risk solutions in India

Pages

  • About US
  • ADVERTISE ON FIINEWS.COM
  • CONTACT US
  • EVENTS
  • FII-NEWS.COM PDF ARCHIVE
  • Home
  • News
  • PRIVACY POLICY
  • About
  • Advertise
  • Careers
  • Contact us

© 2026 FIINEWS - Design and developed by 7clicksmedia.

No Result
View All Result
  • Tenders
  • Projects
  • Markets
  • Manufacturing
  • Investment
  • Technology
  • Exports
  • ASEAN

© 2026 FIINEWS - Design and developed by 7clicksmedia.